1)
Size:30*80*6m
Steel beam&column Material: Q345B
Wall&roof covering: single steel sheet 0.5mm
Door: Two big sliding door,width 6m height 4.5m;
two small door: 0.9m width 2m height
Window: 32PCS width 0.9 height1.2m
2)Professional designers provide design drawings to you at first time,this is drawing of Steel Structure wood processing shed Project In Cameroon
Details of Steel Structure wood processing shed Project In Cameroon
1.Big span:30m,clear span
2.tapered h-section steel column& column:save steel quantity used,save cost
3).We will package goods so it’s easy to put into the containers. We weld rail on the bottom shelf of the goods, then it will be able to smoothly and quickly to load and unload goods. If you still need appliances and other equipment, we can also help you order. Under normal circumstances, the cycle time about from order to delivery, steel structure building is in 30 working days. we can transport goods to the Tianjin port then transportation by sea.